Finishing Touches

It has been a very busy week at Tredway Library. New carpet has been installed,  furniture has been delivered and assembled, and the library staff has moved huge numbers of books. Things are starting to come together. We are excited to have students, faculty, and staff returning to campus to see what our new spaces look like. Welcome back, and come visit soon!

New seating area for quiet study on third floor.

Another quiet study area on third floor.

The second floor of the library.

The new research help desk, on the second floor of the library.

The Special Collections Reading Room, on the first floor of the library, looking out.

 

 

 

This entry was posted in Center for Student Life construction, Special Collections. Bookmark the permalink.

One Response to Finishing Touches

  1. rchopman says:

    The new Spec Coll reading room has so much space! And I love the expanded exhibit area. I’ll have to visit and see the whole thing when I’m in IL next.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s